Part Version Control



Click Image to Enlarge

Part Version Control
To provide for "concurrent" production of part versions, the system requires each part version to be a new part entry. Example: 1444BZ-A1 (Part Name - Prodution Version) 1444BZ-A2 is a complete new part / drawing etc. This clearly associates the proper drawing (it's graphic), and dimension requirements with each part. It also allows for concurrent production when necessary. Furthermore, the production history and specific production control issues; from a Quality Control point of view remain unique and specific to that part.

The direct association of support Graphic documents (drawings, backsheets, etc) with unique 'Part - Revision' not onloy organizes information, but places it directly accessable to the user.





Paradigm Software Group Inc. All rights reserved - Since 1992
Site created and SEO managed by: Paradigm Software Group
Read our Legal policy and Privacy policy

Home
User Quotes
Quick Overview
Central System Management
Shop Floor
Total Quality Management
Quality Assurance in Production
Part Version Control
Central Gauge management
Electronic Messaging
Six Sigma Charting
Gauge Reading Capture
Web Based Manufacturing SPC
Eliminate Overhead Costs
Contact Us
  • Data
    Risk Management - Gauge / Standards - Production Control
    Follows gauge per use, required certificate by date, per shift gauge operational check, per shift Machine maintenance check.
  • Data
    ISO Compliance - Risk Management & Production Control
    Requires Machine maintenance check, and Gauge operation check when job is activated per user, per shift.
  • Data
    Reduce your Technical costs
    No need for in-house servers and hidden costs when you use ByDesign Production System.
    




ByDesign In Use